How Long Does an Excavation Project Take?
From a half-day trench to a week-long foundation dig, here's what actually drives an excavation timeline.
"How long will it take?" is one of the first questions we get. The honest answer is it depends — but the factors are predictable. Here's how excavation timelines usually break down in the Kitchener area.
Typical timelines
- Utility or drainage trench: often a single day
- Grading a residential lot: one to two days
- Foundation or basement dig: two to five days depending on size and soil
- Full site prep for a new build: up to a week or more
What can add time
- Rock, heavy clay, or a high water table
- Tight access that limits equipment size
- Weather — heavy rain can pause a dig
- Waiting on locates or permits (plan these early)
The single biggest schedule saver is booking your locates and permits ahead of time. We handle that coordination as part of the job.
Frequently asked questions
Does rain delay excavation?
It can — saturated ground is unsafe and messy to work in, so heavy rain may push a dig by a day or two.
How far ahead should I book?
Ontario One Call locates take several business days, so booking a week or two ahead keeps your project on schedule.